When to book each stage inspection on a Tarneit build
Slab, frame, lock-up, fixing and PCI: the right moment to inspect each stage and what is lost if you miss it.
Fixing is when plaster, doors, architraves, skirtings and cabinetry are installed and before painting starts. Items found now are corrected before paint covers them.
Tarneit's volume builders run finishing trades quickly. Bowed walls, misaligned cabinetry, doors that bind and plaster joints visible in natural light are the fixing findings we record most, and each is far cheaper to fix before the painters arrive.



Annotated findings from Fixing inspections on Tarneit builds. Client addresses withheld.





1Bored piersAfter the piers are drilled and steel is placed, before concrete
2Slab pre-pourThe day before the concrete pour
3FrameAfter roof trusses are on, before wrap, sarking and roof cladding
4Lock-up (pre-plaster)After brickwork, windows and roof are on, before plasterboard
6WaterproofingAfter the waterproofer finishes, before the tiler starts
7Pre-handover (PCI)At practical completion, three to five days before the builder's walk-through
Slab, frame, lock-up, fixing and PCI: the right moment to inspect each stage and what is lost if you miss it.

Straightness, bracing, tie-downs, lintels and openings. The frame stage is the last time the structure is fully visible.

Flashings, wall wrap, brick ties and mortar joints at lock-up. Membranes, upturns and falls before tiling. Two checks that prevent most water problems.
Instant online pricing, or talk to the booking team on 1300 471 805.
Fixing looks at the finishing trades before paint, so items can be corrected cheaply. PCI is the final list at practical completion, before you take the keys.
Yes. Cabinetry level and alignment, benchtop junctions and appliance provisions are checked before paint and splashbacks go in.
No. Waterproofing has its own inspection before the tiler starts, because the membrane is covered once tiling begins.